Bangerter Highway Overhaul: What Drivers Need to Know Now
Major Construction Updates That Could Impact Your Commute
Utah's Department of Transportation (UDOT) is making sweeping changes to Bangerter Highway, and drivers should brace for significant adjustments. The multi-year project aims to transform one of the state's busiest corridors into a safer, more efficient roadway. Here's the latest on what to expect.
Key Changes Coming to Bangerter Highway
- New Interchanges: Three outdated traffic signals will be replaced with modern interchanges at 4700 South, 6200 South, and 13400 South.
- Extended Express Lanes: Continuous express lanes will run along the entire length of the highway.
- Pedestrian Improvements: Safer crossing points and updated sidewalks for better foot traffic.
- Smart Technology Integration: Advanced traffic monitoring systems to optimize flow.
Construction Timeline Breakdown
- Phase 1 (Now - Fall 2024): Interchange work at 4700 South with lane shifts.
- Phase 2 (2025): Major reconstruction of 6200 South intersection.
- Phase 3 (2026-2027): Final interchange construction at 13400 South.
Smart Driving Tips During Construction
With lane closures and detours expected, drivers should:
- Allow extra travel time during peak hours
- Consider alternative routes like I-15 or local streets
- Check real-time traffic apps before departing
- Watch for changing speed limits in work zones
What Do You Think?
- Is this billion-dollar investment worth the traffic headaches it will cause?
- Should UDOT prioritize other congested areas first?
- Will the new interchanges actually improve safety or just move bottlenecks?
- Are these changes coming too late for Utah's booming population?
Comments
Leave a Reply